The building is made of concrete structure consisting of a building (water tank – ground floor – mezzanine – 5 floors – roof floor) with an approximate area of (2200 m2) on the ground floor, while the area of the fifth floor is (140 m2). The height of the building is about 27 m, but its height with the highest occupied floor is 22.95 m above street level.
Evacuation analysis by pathfinder program to assessment the stairs in the building by performance base design approach Presentation Video
Role in the project
Review and approve fire suppression and fire alarm plans.
Review and approve pine tree control management plans.
Technical work report on the project’s fire protection and security systems.
Emergency plan development and implementation report.
Fire incident report for the project.
The representative implemented the fire protection and security works.